LOADING IMAGES

High Quality With China Price Decorative Cable Channel Forming Machine

Size change by dismount spacers and move rollers to change effective width after roll forming,truly a two in one machine,reduce duplication of investments.
  • lead time:

    45 days
  • form speed:

    12-14m/min
  • shipping port:

    port of Xiamen
  • payment:

    T/T
  • weight:

    4.5T
inquiry now
product details

Work Flow of Decorative Cable Channel Forming Machine:

3Tons Decoiler  →Roll Forming Mill(4kw)→ Sawing Device(penumatic sawing)→PLC Control System→Product Rack(one unit)

 

Main Components of Decorative Cable Channel Forming Machine

1.Manual Decoiler: one set

Un-powered,Manually control steel coil inner bore shrinkage and stop

Max. feeding width: 500mm, coil ID range 470mm±30mm

Capacity: 3-5Ton

With Hydraulic Decoiler for options.

 

2.Cold Rolling Mill:

Material Thickness:0.7-1.0mm,Material Width: 62mm,

With feeding material guide, body frame made from 450# H type steel by welding,Side wall thcikness: 18mm

Rollers manufactured from tooling steel Cr12, precision machined, hard Chrome Coated

Shafts manufactured from 45#,Diameter=φ75mm,precision machined

Motor Driving,Gear chain transmission,11 steps to form

Main Motor=4KW , Frequency speed control 380V/50Hz/3Ph or 220V/60Hz/3Ph

Forming speed approx.12m/min

 

3.Post Cutting

Cutting motor:2.2KW

4.PLC Control System(Touch screen and PLC brand:German Siemens,Inverter brand:Japan Panasonic,Encoder brand:Japan Omron)

Control the quantity and cutting length automatically

Combined with: PLC, Inverter, Touch Screen, Encoder, etc

Cut-to-length tolerance≤±2 mm

Control Voltage 24V

 Truss Forming Machine PLC Control System

 

5.Exit Rack Un-powered,one unit

 

6.User's manual in English

 

Features of Decorative Cable Channel Forming Machine

  This Machine's design saves space and cost for customer convenience.Besides,the change-over can be finished by PLC computer control system in order to offer convenient customer use.

 

After-sale Service
1. The warranty of Ceiling Support Pipe Forming Machine is one year after the client receives the machine. Within the one year, we will courier the replacement parts to the client free of charge.
2. We offer technical support for the entire life of our machines.
3. We can send our technicians to install and train the workers in the clients' factories.

Terms of Trade

1. Minimum order quantity (MOQ): 1 set

2. Delivery time: about 45days

3. Port of loading: port of Xiamen

4. Type of payment: T/T or L/C

5.Packing method: with nude packing steadily fixed in one 40' container suitable for long-distance transportation.

6. Export: Australia, UK, Ireland,Greece, Mexico, Brazil ,Israel ,Dubai, Russia ,India, Taiwan, Singapore,  Malaysia ,Thailand, Philippines, Myanmar ,Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc. 

Request a free quote

If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!

categories
hotproducts
related products
Roofing Panel Roll Forming Machine
Double Layer Tile Roof Roll Forming Machine
Upper Tile Roofing Panel,Down Roofing Panel,Total Two Forming Line
c формовочная машина
C120-200 Purlin Roll Forming Machine
Free Standing Structure
Best Highway Guardrail Machine
Highway Guardrail Machine
High precision and without burrs after cutting.save cost
Floor Decking Roll Forming Machine
Floor Deck Forming Machine For YX76-320-960
Floor Decking Roll Forming Machine is Easy to operate and keep stable.
Roof Panel Roll Forming Machine
Kirby Style Roofing Panel Roll Forming Machine
Easy to operate and running stable,Kirby Style,popular in USA,Middle East&Africa,India and South East Asia
BIPV Boltless Seam Lock Roofing Panel Roll Forming Machine (Installation Of Solar Panel)
Roofing Panel Roll Forming Machine (Installation Of Solar Panel)
This product is specially designed for the installation of rooftop photovoltaic panels
   
chat now chat now
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!